Development of flexible tools for automated land seismic planning. Optimize time and resources.
Planning of seismic survey with an explosive signal source
Record in dynamics phasing & work methods: topo,
drilling and geophysical work
Daily crew performance statistics calculation
Consideration of the surface conditions of the work site: topography, water bodies, forest categories
Interactive analysis of the development plan through a 2D scene and a Gantt chart
Search for the best option to cover the area
Selection of sufficient resources to perform seismic surveys
Quick comparison of different plan-schemes